Experience matters when building a successful biomass energy plant. With over 50 years of experience in Europe and over 10 years of experience in the United States, AESI is ready to help you complete a successful biomass energy project. Examples of typical projects are noted below.
| End-User | Location | System | Details | Benefits |
|---|---|---|---|---|
|
Kentucky Horse Park |
Lexington, Kentucky, US |
Delivering 10 MMBTU/hr hot water, up to 220 kW AESI GLOBAL 240 Biomass Gasification Boiler Pratt & Whitney ORC Generator |
Application: Landfill diversion Fuel: Horse manure and bedding Fuel Consumption: Up to 1.3 tons per hour Thermal Output: Hot water @ 209 C Max Electrical Rated Output: 220 kW |
|
|
Avoca Farms |
Merry Hill, North Carolina, US | Delivering 31.8 MMBTU/hr steam Dual AESI GLOBAL 400 Biomass Gasification Boilers |
Application: Process steam Fuel: Post process plant waste Fuel Consumption: Up to 4 tons per hour Thermal Output: Steam @ 29,400 lbs/hr |
|
|
Katatheon Farms Greenhouse |
Vancouver, BC, Canada |
Delivering 19.8 MMBTU/hr hot water AESI GLOBAL 500 Biomass Gasification Boiler |
Application: Hydronic heating Fuel: Waste wood Fuel Consumption: Up to 2 tons per hour Thermal Output: Hot water @ 90 C |
|
|
Garden Valley School District |
Garden Valley, Idaho, US |
Delivering 2.4 MMBTU/hr hot water AESI GLOBAL 60 Biomass Gasification Boiler |
Application: Heating Fuel: Wood chips Fuel Consumption: Up to 0.5 ton per hour Thermal Output: Hot Water |
|
|
St. Ansgar School District |
St. Ansgar, Iowa, US | Delivering 1.6 MMBTU/hr hot water AESI BIOTEC 40 Biomass Gasification Boiler |
Application: Heating Fuel: Oat Hulls Fuel Consumption: Up to 0.3 ton per hour Thermal Output: Hot water |
|